
100% Pass Your C_P2W22_2504 Exam Dumps at First Attempt with Actual4Dumps
Penetration testers simulate C_P2W22_2504 exam PDF
NEW QUESTION # 22
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- B. The consistency check must be performed.
- C. The assigned routing and bill of material (BOM) must have the same validity period.
- D. The lot size range must be within the lot size range of the assigned routing.
- E. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
Answer: B,D,E
NEW QUESTION # 23
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative opening period
- B. Specify a negative planning horizon
- C. Specify a negative PP/DS horizon
- D. Specify a negative offset time
Answer: D
NEW QUESTION # 24
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?
- A. Advanced Planning
- B. Integrated Business Planning
- C. Flexible Planning
- D. Standard Sales and Operations Planning
Answer: B
NEW QUESTION # 25
What can you use standard heuristics in Advanced Planning (PP/DS) for?
- A. To solve planning problems for defined objects
- B. To optimize costs and times in production plans
- C. To set default values in production master data
- D. To automate material movements in material staging
Answer: A
NEW QUESTION # 26
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Production order
- B. Routings
- C. Work center
- D. Bill of material
Answer: B,D
NEW QUESTION # 27
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you post the goods receipt
- B. When you record inspection results
- C. When you execute batch determination
- D. When you release the batch
Answer: A,B
NEW QUESTION # 28
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Material stock is built up for a long period of time in production.
- B. Replenishment is always triggered on a regular basis.
- C. Replenishment is only triggered when components are required.
- D. Material is only kept available in small quantities in production.
Answer: C,D
NEW QUESTION # 29
How would you define a pegging structure for an order in the context of Advanced Planning?
- A. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
- B. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
- C. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
Answer: D
NEW QUESTION # 30
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Requirements type
- B. Planning strategy
- C. Requirements profile
- D. Order type
Answer: A,B
NEW QUESTION # 31
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To enable simple structuring of BOMs
- B. To make the assignment of components easier
- C. To make the procurement easier
- D. To reduce the number of material masters
Answer: A,B
NEW QUESTION # 32
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Float after production
- B. Setup time
- C. Opening period
- D. Total replenishment lead time
Answer: A,B
NEW QUESTION # 33
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
- A. When alternative resources are used within one operation
- B. When several operations are maintained for one product
- C. When several production versions are maintained for one product
- D. When multiple planned orders are scheduled in parallel on one resource
Answer: A
NEW QUESTION # 34
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material type
- B. By plant
- C. By change number
- D. By material status
Answer: A,B
NEW QUESTION # 35
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing an operation time
- B. Changing a dependent requirement
- C. Changing a storage bin
- D. Changing a delivery address
Answer: A,B
NEW QUESTION # 36
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.
- A. Scheduling agreement schedule line
- B. Purchase order
- C. Production order
- D. Planned order
Answer: A,D
NEW QUESTION # 37
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Material
- C. Plant
- D. Work center
Answer: B,D
NEW QUESTION # 38
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special procurement type inside the material BOM (bill of material)
- B. Select a special explosion type inside the material master
- C. Select a special procurement type inside the material master
- D. Select a special explosion type inside the material BOM (bill of material)
Answer: A,C
NEW QUESTION # 39
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- B. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to one batch if the product quality changes during production.
- D. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
Answer: A,B
NEW QUESTION # 40
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the supplier to the production storage location
- B. To control the flow of material from the production storage location to the central storage location
- C. To control the flow of material from the central storage location to the production storage location
- D. To control the flow of material from the supplier to the central storage location
Answer: C
NEW QUESTION # 41
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Net requirements calculation is carried out for every sales order individually.
- B. Planned orders are created in MRP with reference to sales orders.
- C. Production and procurement costs are managed on the sales order item level.
- D. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- E. Storage location MRP areas are required to manage sales-order-specific stock.
Answer: A,B,C
NEW QUESTION # 42
......
All C_P2W22_2504 Dumps and Training Courses: https://examsboost.actual4dumps.com/C_P2W22_2504-study-material.html